This new design meets and exceeds the building codes for all Cities and Counties. Now Contractors can safely tuck all of the electrical wires inside of the junction box, have a flush mounted fixture and pass any electrical inspections. No need to come back after the final inspection to reinstall the ceiling fans flush or without a box.
How to installation guide for existing & new aluminum patio cover builds.